  • Project Name: 6th October 600 MW Power Plant
  • Status: Completed
  • Contract Date: 2011 - 2012
  • Project Details:
    • Installation of all 220 kV GIS System. In addition Our activities including the following
    • Installation of conduit and cable tray systems
    • Installation of MV Cables
    • Installation of Cables
    • Installation of Optical Fibre Cables.
    • Installation of AC/DC system
    • Installation of Light current systems.
    • Installation of Communication ,Control and Protection systems.
    • Installation of 220 kV Surge Arrestors.
  • Project Name: Cairo West Power Plant
  • Status: Completed
  • Contract Date: 2009 - 2010
  • Project Details:
    •  Supply, testing, erection, commissioning and start up of load centre, communication modules and connection with SCADA system
  • Project Name: CAIRO FESTIVAL CITY-Honda-Toyota Area
  • Status: Completed
  • Contract Date: 2008-2010
  • Project Details:
    • Supply and installation of all electrical /light current work
    • Installation of MV cables (60 KM)
    • Installation of MV cubicles.
    • Installation of earthing system
    • Installation & termination of fibre optics cable
    • Installation of telephone network.
    • Commissioning and start up
  • Project Name: Mobinil & Mobi-factory Steel Towers Administration Buildings in 6 Of October
  • Status: Completed
  • Contract Date: 2008
  • Project Details:
    • Supply, installation, testing, and commissioning of electrical / light current systems
    • Fabrication and installation of cable trays
    • Installation of MV and LV cables.
    • Installation of transformers
    • Installation of LV & MV switchgears
    • Installation of earthing system
    • Installation of lighting system
    • Installation of telephone network.
    • Installation of data network
  • Project Name: Nubaria Automatic Slaughter
  • Status: Completed
  • Contract Date: 2008
  • Project Details:
    • Supply & installation of all electrical / light current system work
    • Fabrication and installation of cable trays
    • Installation of MV and cables (3.5 KM)
    • Installation of MV cubicles
    • Installation of earthing system
    • Installation of lighting system
    • Installation of telephone network.
    • Installation of fire alarm system
    • Installation of data system
    • Installation of CCTV system
  • Project Name: Alexandria Petroleum Company
  • Status: Completed
  • Contract Date: 2008
  • Project Details:
    • Installation of all light current work
    • Fabrication and installation of cable trays
    • Installation of optical fibre cables
    • Installation of fire alarm system
    • Installation of CCTV system
    • Installation of Scada System

ABB

  • Project Name: Fayoum, Banisuef & Minia Water Plant – USAID Project
  • Status: Completed
  • Contract Date: 2003 - 2005
  • Project Details:
    • Installation of all instrumentation work.
    • Vibration and temp. monitoring for main MV motors (raw water pump station) using Bently Nevada System
    • Installation of all instrumentation work (pressure transmitters, pressure switches-pressure gauges- level switches- level indicators- flow meterscontrol valves)
    • Calibration of a.m. instruments
    • Installation of fire alarm system
    • Installation of communication system
    • Installation of data system
    • Installation of all Electrical Systems

ABB

  • Project Name: Alexandria Sewage Treatment Plant- Smouha
  • Status: Completed
  • Contract Date: 2002 - 2003
  • Project Details:
    • Installation of all instrumentation work.
    • Vibration and temp. monitoring for main MV motors (raw water pump station) using Bently Nevada System
    • Installation of all instrumentation work (pressure transmitters, pressure switches-pressure gauges- level switches- level indicators- flow meterscontrol valves)
    • Calibration of a.m. instruments
    • Installation of fire alarm system
    • Installation of communication system
    • Installation of data system
    • Installation of all Electrical System