Our Projects

  • Project Name: Proctor & Gamble Baby Care Extension Factory – 6th October city
  • Status: Completed
  • Contract Date: 2009-2010
  • Project Details:

    •  Detailed engineering and work shop
    •  Drawing for all electrical work 
    •  Control and instrumentation system work shop drawings 
      • Hook up details of all instruments
      • Instrumentation cables design and routing.
      • Junction box termination details.

  • Project Name: HAMMA Desalination Plant (ALGERIA
  • Status: Completed
  • Contract Date: 2009-2010
  • Project Details:
    • Detailed engineering and work shop drawing for all electrical work
    • Control and instrumentation system work shop drawings
      • Hook up details of all instruments
      • Instrumentation cables design androuting.
      • Junction box termination details.
  • Project Name: Cairo Airport Terminal 2
  • Status: In Progress
  • Contract Date: 2013
  • Project Details:
    • Installation of all electrical work
    • Installation of all cable trays
    • Installation of MV and LV cables
    • Lighting system
    • Small power system
    • UPS system
    • Fire alarm system
  • Project Name: Mesryoon Steel 220 kV Outdoor S/S
  • Status: In Progress
  • Contract Date: 2015
  • Project Details:
    • Installation of all S/S steel structure
    • Installation of 220 kV CBs
    • Installation of 220 kV Disconnectors.
    • Installation of 220 kV CT
    • Installation of 220 kV Surge Arrestors
    • Installation of 220 kV Bus Bar System.
    • Installation of 2 90MVA Transformers.
    • Installation of 70 MVA Transformer.
    • Pre-commissioning of all a.m. items
  • Project Name: Mesryoon Steel 220 kV Outdoor S/S
  • Status: In Progress
  • Contract Date: 2015
  • Project Details:
    • Installation of reactors, disconnectors, VTs, CTs, Bus Bars
    • Installation of Thyristor Control Systems.
    • Piping System including welding
    • Installation of PF correction system.
    • Pre-commissioning of all a.m. items
  • Project Name: Cairo Airport Terminal 3
  • Status: Completed
  • Contract Date: 2005-2008
  • Project Details:
    • Installation of all electrical work
    • Installation of all data networks
    • Installation of cable trays (3600 Meter)
    • Installation & Termination of UTB cables (40 KM)
    • Installation & Termination of optical fibre cables (60 KM)
    • Installation of racks and rack components
  • Project Name: Airport 220/66/11 kV GIS S/S
  • Status: In Progress
  • Contract Date: 2013
  • Project Details:
    • Installation of two 125 MVA 220/66 kV transformer
    • Installation of HV cables
    • Installation of MV cables
    • Installation of light current Control & Optical Fibre Cables.
    • Installation of AC/DC system
    • Installation of control and protection panels
    • Installation of communication panels
    • Installation of battery system
    • Installation of MV switchgear
  • Project Name: Abu Ghaleb 220/66 kV GIS S/S
  • Status: Completed
  • Contract Date: 2013
  • Project Details:
    • Installation of two 125 MVA 220/66 kV transformers
    • Installation of HV cables
    • Installation of cables
    • Installation of Light Current Control & Optical Fibre Cables.
    • Installation of AC/DC system
    • Installation and connection of control and protection panels
    • Installation of battery system
    • Installation of communication system